The dirt work (site prep) has been
completed. The pad is now ready for the concrete forms.
(Click on the thumbnails below to enlarge. Click back browser
button to return.)
Forms Ready For
Finished Concrete Beams
Concrete
and Piers
Now that the concrete beams and piers have been poured barn construction is ready to begin.
Unloaded
Barn Stacked
Barn Laid Out
and Ready for Install
Starting the
Install
Bolting the Walls Together
Squaring the Walls
Standing the Divider Wall
Between Stalls
All Walls Up and Ready
Installing the Rafters
to Install Rafters
Installing a Side Gable
Installing a RCA Gable
Building the Front
Two Side Gables Standing
Side Porch Gables
on the Front Porch
Installing T-111 Drop
Installing the Lower Roof Panels
Ceiling in the Tack Room
over the Roof Insulation
Lower Roof Installed
Installing the Upper Roof
Installing the Ridge Cap
Barn Construction Complete
_small.jpg)
The barn construction is now complete and ready for your horses.